Have a brain break

22 tons concrete beam being lifted with SiteCover Cranes.

 

 

Watch this 22 tons concrete beam being lifted and positioned +50 meters down the construction site in Copenhagen with SiteCover cranes. 

No wind, no rain and no swaying crane arms.

Construction like it was in a factory.....pure and simple.