TetraPak Processing, Pronsfeld, Germany
In June 2020, SiteCover signed a contract with TetraPak Processing, to cover the production for a part of the milk powder tower. SiteCovers first project in Germany.
- Project: Arla Milk Powder factory
- Client: TetraPak
- Dimensions: 57,6 m long and 28,8 m wide with a height under hook of 20 m.
- Time schedule: Assembly 9 days. Operational from 31st of August to 15th December 2020.
- Crane capacity: 2 pcs 12 t hoists. Capable of lifting 22 t together.