Ed Sheeran, Wembley Stadium, London, Croke Park, Dublin
SiteCover stood tall at Wembley and Croke Park for 5 concerts with +80.000 fans, intriguing music and beautiful scenery
![](/fileadmin/_processed_/a/1/csm_ES_001_df0d08c27d.jpg)
![](/fileadmin/_processed_/a/e/csm_ES_003_hovedfoto_94e4f70176.jpg)
![](/fileadmin/_processed_/3/a/csm_ES_002_edcf096113.jpg)
![](/fileadmin/_processed_/c/4/csm_ES_004_99ae44287f.jpg)
![](/fileadmin/_processed_/c/a/csm_ES_005_724a3b1fe9.jpg)
![](/fileadmin/_processed_/4/d/csm_ES_006_bf708575e3.jpg)
![](/fileadmin/_processed_/9/0/csm_ES_007_1bd48e373a.jpg)
![](/fileadmin/_processed_/5/0/csm_ES_009_6a0f5ba1b5.jpg)
![](/fileadmin/_processed_/7/8/csm_ES_010_512574700b.jpg)
![](/fileadmin/_processed_/8/6/csm_ES_011_9ea4f57714.jpg)
![](/fileadmin/_processed_/9/6/csm_ES_012_f50322912c.jpg)
![](/fileadmin/_processed_/4/a/csm_ES_013_9202dabdea.jpg)
![](/fileadmin/_processed_/d/c/csm_ES_014_0efa4967df.jpg)
Not only a tough worker, but also a pretty face
When stage- and light designers from UK by coincidence looked over the shoulder of SiteCovers designing team, during the later stages of product-development, they were excited about what they saw. The structures ability to carry weight and the all-over design, inspired them to reconfigure the constructionsite cover into a concert stage.
The result was that SiteCover travelled straight from the test-assembly site in Stettin, Poland to Wembley Stadium in London, to supply, not only fair weather, but also a proper frame for Ed Sheerans one-man show at the mighty stadium.
SiteCover moves on
After 3 magical nights at Wembley, the structure was disassembled and moved to Dublin, and the process was repeated. SiteCover stood tall at Croke Park for 2 nights with 80.000 fans, intriguing music and beautiful scenery.