Gå til hoved-indhold

Have a brain break

22 tons concrete beam being lifted with SiteCover Cranes

Watch this 22 tons concrete beam being lifted and positioned +50 meters down the construction site in Copenhagen with SiteCover cranes.
 

No wind, no rain and no swaying crane arms.


Construction like it was in a factory.....pure and simple.