This is what 800m3 of water looks like
The amount of water the SiteCover structure collected in February 2022
During February we measured several incidents of +30 mm of precipitation on our 6500m² SiteCover structure in Copenhagen .
30 mm of precipitation on a 6500 m² area is 200m3 of water collected and sent to the sewers.
200 m3 of water that did not end up on the construction site and in the building being built.
Watch the video! Let it run for 40 seconds. You have now seen 800 m3 of water shoot past Richard Hammond. This is the same amount of water the SiteCover structure collected in February.
These huge amounts of water have an equally huge impact on economy, time schedule, quality and CO2 emissions on construction projects. Equally huge savings can be realized when new construction is built under SiteCover weather protection with build-in cranes.